Battle of the excavators!

One excavator is drilling Screw piers like a mosquito
«13

Comments

  • What is the project C Man Is it an extension or a front yard landscaping project KK 
  • more pics of the new extension
  • Hey C-man, Ugly looking view you have to deal with  ;)  I suspect it is a little lighter on the breeze front than the SW gales Bean Flying gets of the Southern Ocean  :rofl: :stir
  • Ahhhh sand. So easy to dig, so easy to build on, so easy to screw pier.  Building on the ground C- man, tsk tsk tsk  :D :D. I'm pretty sure I almost bought a place in that street
  • finally a slab!
  • That was quick work Is this extension design going to take advantage of the Sunshine Coast sea views KK
  • Great work C-Man.  You move fast, you'll have it done by next friday! lol.  Only kidding. ;) I'll have to pop over for an inspection some time.  So what's going on the ground floor?  A garage I assume, but what else.  It's a pretty big block you have and the house is going to be massive when you've finished! I know where the next social is going to be on the Sunshine coast! ;)
  • on 1367652325:
    That was quick work Is this extension design going to take advantage of the Sunshine Coast sea views KK
    no windows just blocks
  • on 1367652374:
    Great work C-Man.  You move fast, you'll have it done by next friday! lol.  Only kidding. ;) I'll have to pop over for an inspection some time.  So what's going on the ground floor?  A garage I assume, but what else.  It's a pretty big block you have and the house is going to be massive when you've finished! I know where the next social is going to be on the Sunshine coast! ;)
    ground floor, garage, lounge, laundry and a couple bedrooms the extension will add 250M2 when you count up and down and decks we have existing just 100m2
  • I will try to post some plans
  • on 1367657848:
    we have existing just 100m2
    That's bigger than my house C-man. How many people will be living there ?
  • not mucking around! slowed down by the rain but still going.
  • flying along despite the rain
  • Geeze... Those brickies are motoring!  Nice one mate!
  • Deep in the shudder shudder phase. Vulnerable until core filled. Fingers crossed for gentle breezes C-Man  :thumb:
  • on 1368100239:
    Geeze... Those brickies are motoring!  Nice one mate!
    So do brickies still work on a $1 cut, $1 to lay and above 6 foot she's $1.50.. I suspect those bricks incur a surcharge due to weight... So assume $2.50 a brick to lay!  Never seen a poor brickie and would never want to mess with one!
  • The last blocky crew I worked with charged $3 per block and $3 per block to lay. Prick of a job.
  • on 1368131670:
    The last blocky crew I worked with charged $3 per block and $3 per block to lay. Prick of a job.
    I'd prefer Laying and cutting to rendering!  I hate rendering!!!
  • Wow it's almost up But by the time I have posted my reply, the block work will probably be finished KK
  • on 1368166646:
    I'd prefer Laying and cutting to rendering!  I hate rendering!!!
    Posts, bears and joist for me Brett. Building on the ground is just plain wrong IMO
  • Is it beer'o'clock yet?.... BTW I'm a fan of lightweight construction and massive insulation... Cool in summer... Snuggly in winter... All two weeks of it, that is....
  • on 1368177338:
    BTW I'm a fan of lightweight construction
    Hallelujah !  :thumb:
  • the lower section is piers with bearers and joists, because of the lower height 3.7M block was the only real option for strength and 3 car garage also block allows big open plan upstairs with lots of glass and still strong I buy blocks for $209 ea and pay $2.70 for laying, cutting is extra $20 per M The block team gave me a good kick start,  3 weeks to this stage. soon it will just be me and another chippy slogging it out.
  • on 1368245578:
    soon it will just be me and another chippy slogging it out.
    When the skilled trades arrives eh C-Man  :D :thumb: :thumb:
  • on 1368341462:
    When the skilled trades arrives eh C-Man  :D :thumb: :thumb:
    you got that right......
  • presto! a good kick along from the Blockies.
  • Smashin' it mate.  What a view!
  • looks like old Roman ruins in the moonlight. 5 weeks this Friday, 5 Friday pours in a row.
  • Was that I saw pulling out of Belmonds car park this morning? ;) Looking good.  When can I come around for an inspection with my Building Surveying hat on? :)
  • Do those blokes give the cement time to cure ? Boy they are fast KK